01/ Framework
Eight dimensions, one readiness profile
The framework covers 8 dimensions and 45 indicators, using a scale of 1 to 5. Each indicator is assessed against traceable evidence.
Innovation readiness
An evidence-based diagnostic to understand the readiness of strategic innovation and industrialization initiatives before feasibility studies.
Explore the dimensions01/ About
Rules that are still being developed, overlapping mandates, and competing stakeholder priorities can slow strategic initiatives. An early assessment helps identify these barriers before feasibility studies.
DII assesses readiness across eight dimensions using traceable evidence. The readiness profile summarizes the initiative’s strengths, main barriers, and areas for follow-up.
02/ How it works
The proposed process has four stages with distinct responsibilities.
Initiator
The Initiator prepares a proposal describing the problem, its context, the intended impact, and the initiative’s stage of development.
Assessment Team
The Assessment Team assesses indicators across eight dimensions against traceable evidence and records where evidence is insufficient.
Reviewer
The Reviewer checks whether the assessment is consistent, the evidence is sufficient, and the process follows the methodology.
Managing Authority
The Managing Authority ratifies the reviewed assessment. The findings inform follow-up recommendations and can help frame the terms of reference for the next study.
03/ Dimensions
The proposed assessment identifies three key dimensions. They are Institutional Foundation, Constitutional Guardrails & Public Value, and Stakeholders. Weaknesses in each key dimension warrant separate attention when determining next steps.
Availability of rules, consistency of their application, cross-agency coordination, and public legitimacy.
Bahasa IndonesiaReadiness of human capital, research, funding, infrastructure, and innovation culture to produce breakthroughs.
Bahasa IndonesiaReadiness of implementing entities, funding mobilization, coordination across the ecosystem, and the ability to scale adoption.
Bahasa IndonesiaProduction capacity, supply-chain resilience, the industrial workforce, and cost competitiveness.
Bahasa IndonesiaStrategic alignment, clarity of objectives and trade-offs between priorities, sequencing, and accountability for national impact.
Bahasa IndonesiaThe system’s ability to fix itself, adjust course, or halt policies that are not working.
Bahasa IndonesiaLegal compliance and public values: equity, ethics and rights, integrity, and strategic sovereignty.
Bahasa IndonesiaInvolvement of the necessary parties, clarity of roles and authority, alignment of incentives, and responsibility for coordination.
Bahasa Indonesia04/ Governance
Every assessor signs a conflict-of-interest declaration and never scores an initiative they work on themselves. When a conflict is found, the assessor is replaced.
The Managing Authority appoints the Assessment Team and Reviewer through recorded assignment letters.
A score is valid only when supported by traceable evidence. Data that cannot be found is recorded as a data gap.
The proposed process limits access to initiative-level results to authorized parties.
05/ Questions
The readiness profile identifies barriers and areas that need attention. The authorized decision-maker remains responsible for the investment decision and can consider DII findings alongside other evidence and studies.
DII helps identify institutional, regulatory, and stakeholder issues that need further study. A separate feasibility study examines whether the initiative is viable.
The public can read about the purpose, dimensions, process, and governance of the assessment. Initiative-level results are for authorized parties.
Useful evidence depends on what is being assessed. To clarify responsibilities, a team can show an assignment document or decision that is still in effect. To explain technical readiness, it can show a test report that records the scope, conditions, and results. These examples illustrate how to trace the basis of an assessment.
Connect each barrier to a decision that needs to be made. If responsibilities remain open, the next step can be to agree on who has authority. If technical evidence is limited, the next step can be to design a test or feasibility study around a clearer question.
06/ Information
01/ Framework
The framework covers 8 dimensions and 45 indicators, using a scale of 1 to 5. Each indicator is assessed against traceable evidence.
02/ Evidence
A score is valid only when supported by traceable evidence. Data that cannot be found is recorded as a data gap.
03/ Governance
The proposed process assigns separate responsibilities for proposal preparation, assessment, review, and ratification.